Emerson

Emerson Climate Technologies

Client: Emerson Climate Technologies
Name of Project: Arc Flash Risk Assessment Study

Requirement

The Emerson Electric Company is an American multinational corporation headquartered in Ferguson, Missouri, United States. This Fortune 500 company manufactures products and provides engineering services for a wide range of industrial, commercial, and consumer markets. Emerson has approximately 103,500 employees and 205 manufacturing locations worldwide. Emerson global standards for electrical safety require that Arc Flash Risk Assessments are carried out at all manufacturing facilities.

Solution

Electrical Safety UK Ltd were contracted to undertake an Arc Flash Study at the Cookstown Plant, Northern Ireland to IEEE 1584, and to deliver awareness training to staff and contractors.

Approach

ESUK agreed the scope and strategy with site management in Northern Ireland. ESUK’s standard Windows based software tool, EasyPower® was used to model the electrical systems. ESUK supply a copy of EasyPower® with every completed Arc Flash Study.  ESUK carried out the discovery phase of the work, gathering information on the substantial 11kV distribution system and the large amount of low voltage switchboards, Load Centres and equipment.

Once the distribution model in EasyPower® was completed: short circuit; simple co-ordination; & arc flash studies were carried out. Any instances where the 3-phase prospective short circuit current exceeded the breaking capacity of protective devices was highlighted in the report. Protection curves showing any instances of mis coordination were provided. Incident energy levels and arc flash boundary distances were listed for all equipment included in the scope.

Single line diagrams for the network were provided. Incident energy analysis was then carried out and preferred options and order of magnitude costs were given for the reduction of the incident energy, including guidance on the ALARP requirement. Arc flash equipment labels were dispatched to site once the design was approved by site personnel. Arc flash PPE guidance was included in the report as was guidance on equipment risk assessment. Finally, electrical personnel on-site received site-specific arc flash awareness training.

Other Case Studies

Pfizer, Walton Oaks

About Pfizer Pfizer’s UK commercial headquarters are located in Walton Oaks in Surrey. Opened in 2002, the 320 acre site houses around 700 employees, who

Read More »
Xodus group

Xodus Group

About Xodus Group Xodus provides engineering and advisory services to clients in the oil and gas, LNG, renewables and utility industries worldwide. Requirements ESUK received

Read More »
Volker Rail

VolkerRail

About Volker Rail Since entering the construction market in 1935 VolkerRail has become one of the UK’s leading multi-disciplinary railway infrastructure contractors, with over 70

Read More »
honda Arc Flash Consultation – DC Calculations

Honda Racing

About Honda Racing Honda Racing is an engine manufacturer and supplier based in Milton Keynes, Buckinghamshire currently involved in Formula One racing supplying the Red

Read More »
Wessex Water LV Electrical Safety Rules Training

Wessex Water

About Wessex Water Wessex Water initially contacted Electrical Safety UK with a need for the initial training 300 of the Wessex Water employees in their

Read More »